Question

JIT (Just-in-Time) and Lean Management.

17 Feb 2026
Answer :
Word Count : 214
AspectJIT (Just-in-Time)Lean Management
DefinitionA strategy where materials are only ordered and received as they are needed in the production process.A methodology aimed at improving efficiency by eliminating waste and improving value through continuous improvement.
ObjectiveTo ensure that materials and components are available exactly when needed, without holding excessive stock.To optimize the entire value stream by eliminating all forms of waste.
ApproachPull system, where production is based on actual demand rather than forecast.Focus on process improvements and systematic elimination of waste (e.g., time, defects, overproduction).
ScopeNarrower, focused mainly on inventory management ______ ___ ___ ________ _________ ____.
__________ ___ _____ ________ ____ _________ _________ _________.
________ _________ __________ _____ ____ ___.
_________ ____ _____ _______ ____.
___ ___ ____ ________ _______ _____ ______ __________ ______ _______ __________.
__________ __________ ________ __________ _______ ___ ___ _______ ______ _____ ________.
_____ ___ _______ __________ __________ _________ _____.
_____ ______ ___ _____ _____ __________ __________ ____ __________ _______.
____ ______ _________ ________ _____ ________ _____ _________ _____.
______ _______ ____ ___ ____ _____ ___ _________ ____.
_______ _________ _________ _________ ____ _____.
_________ ________ _________ _______ _______ ______ ___.
_______ ________ __________ ____ ______ ________.
________ _________ ___ __________ _____ ___ ________ _______.
___ __________ ______ ___ __________ _______ _______ _____ ___ _________ ___.
______ ______ __________ ______ _________ ___ ___ _________.
IGNOU ACADEMY
Your IGNOU journey, made easier.
  • Solved Assignments
  • Study Notes
  • Guess Papers
  • Question Papers
Skip in 10
Top